Monthly line specific on-time running and reliability September 2023

Started by ozbob, November 11, 2023, 07:21:13 AM

Previous topic - Next topic

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Individual lines

Spreadsheet: https://backontrack.org/docs/qr/monthly_otr/2023/sep/all_lines_monthly_apr19tosep23.ods

























Combining the Queensland Rail total (aggregate) results on the same axes allows an appreciation of what is happening overall.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Overall FMA 24/7 and CP was > 95% for September.  Improvement.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Facebook ...

Update on on-time running performance for Queensland Rail Citytrain Month of September 2023 11th November...

Posted by RAIL - Back On Track on Friday, 10 November 2023
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Sent to all outlets:

Update on on-time running performance for Queensland Rail Citytrain Month of September 2023

13th November 2023

Greetings,

Citytrain services, including peak and off-peak, are measured as on-time when they arrive within three minutes and 59 seconds of their scheduled time, except for the interurban services viz. Gold Coast, Rosewood and Sunshine Coast lines, which are measured as on time if they arrive within 5 minutes and 59 seconds.

Target is services > 95% on time, all lines.
FMA = force majeure adjusted
CI = customer impact (what passengers actually experience)
CP = combined peaks

The on-time running (OTR) data is published on or about the 10th each month for the month preceding the last month at https://www.queenslandrail.com.au/aboutus/ourperformance/service-punctuality-and-reliability

Be good if this delay in reporting the OTR could be reduced from around 6 weeks to 2 weeks please.

Overall (aggregate) OTR results for 24/7 FMA and CP FMA measurements were back above the target of 95% (see graph below). Well done.

Reference at the RAIL Back On Track forum > https://railbotforum.org/mbs/index.php?topic=15410.0
where detailed analyses of all individual lines are available.

Regards
Robert

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track https://backontrack.org

Combining the Queensland Rail total (aggregate) results on the same axes allows an appreciation of what is happening overall.



image: https://backontrack.org/docs/qr/monthly_otr/2023/sep/qrtotalsep23.jpg