ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


ozbob

Individual lines

Spreadsheet: https://backontrack.org/docs/qr/monthly_otr/2023/apr/all_lines_monthly_apr19toapr23.ods

























Combining the Queensland Rail total (aggregate) results on the same axes allows an appreciation of what is happening overall.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The last six months has seen a significant drop off in OTR performance.

April was a slight improvement but still a long way from the targets. 
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Facebook ...

Update on on-time running performance for Queensland Rail Citytrain Month of April 2023 14th June...

Posted by RAIL - Back On Track on Tuesday, 13 June 2023
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://www.facebook.com/RAILBackOnTrack/posts/650292253804300?comment_id=302869865447941

Minister Mark Bailey MP could you please advise what is being done about the poor OTR for Citytrain please? Some lines e.g. Cleveland, OTR is not acceptable. The single line section between Manly and Cleveland is now many years behind in upgrading.
All lines can be reviewed at https://railbotforum.org/mbs/index.php?msg=271961
Robert

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Train fleet reliability is an issue.  Signalling system is having constant issues.

Then we have the randoms such as bridge strikes, LX strikes, medical emergencies and so forth.

Put it all together and there is a loss of OTR.  QR Citytrain used to be very good once.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

I am getting increasingly concerned about the apparent poor reliability of the train fleet, both QR's and Translink's (NGRs). 

CRR opening is going to go off with the big bang hey?  :dntk

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Quote from: ozbob on June 14, 2023, 10:02:17 AMhttps://www.facebook.com/RAILBackOnTrack/posts/650292253804300?comment_id=302869865447941

Minister Mark Bailey MP could you please advise what is being done about the poor OTR for Citytrain please? Some lines e.g. Cleveland, OTR is not acceptable. The single line section between Manly and Cleveland is now many years behind in upgrading.
All lines can be reviewed at https://railbotforum.org/mbs/index.php?msg=271961
Robert

^

https://www.facebook.com/RAILBackOnTrack/posts/650292253804300?comment_id=302869865447941&reply_comment_id=982220516302892

I am surprised Minister Mark Bailey MP that you have not responded. There are clearly some major issues with the train fleet, and constant signalling issues on the network. CRR is shaping up to be a timetable flop. Now is the time time to sort things.
Robert
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

OTR for Citytrain is now at the worst levels since the detailed OTR line data became available.

Ignoring it is not going to improve it.

I am appalled by the lack of response. 