• Welcome to RAIL - Back On Track Forum.
 

ALP - Proposed LX grade separations

Started by ozbob, September 26, 2015, 11:14:52 AM

Previous topic - Next topic

ozbob

Twitter

Kim Flesser ‏@FastFless 2h

Great response for Rod Harding's plan to fix Banyo Rail Crossing intersection

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Grade separations are one of the best ' bangs for the buck ' going ...

Well done on these policies.  We would like to see more.

Take a look at what is happening in Melbourne -  full pelt grade separation > http://railbotforum.org/mbs/index.php?topic=11281.0

We need to do more of this in and around Brisbane to maximise the benefits and  minimise costs in the longer term.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Daniel Bowen blog --> Benefits to non-motorists from level crossing removals


" ... In summary, it's a bit blinkered to paint grade separation as only benefiting motorists. Many others, including train users, directly benefit from removal of level crossings ... "
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

#Metro

Negative people... have a problem for every solution. Posts are commentary and are not necessarily endorsed by RAIL Back on Track or its members.

ozbob

^

Twitter

Rod Harding ‏@Rod4Bris 13m

Lindum Rail Xing is a major bottle neck in Brisbane's East - Cr Cumming, Kerryn & I are delivering $5m to fix it

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳