• Welcome to RAIL - Back On Track Forum.
 

31 Oct 2014: SEQ: Fare unaffordability crisis continues

Started by ozbob, October 31, 2014, 03:41:25 AM

Previous topic - Next topic

ozbob

Media release 31st October 2014



SEQ: Fare unaffordability crisis continues

RAIL Back On Track (http://backontrack.org) a web based community support group for rail and public transport and an advocate for public transport passengers has said the TransLink performance snap shot data for September 2014 has again confirmed that fare 'affordability' remains at crisis levels. Worst ' affordability ' ever recorded.

Robert Dow, Spokesman for RAIL Back On Track said:

"Fares for public transport in SEQ have gone up in real terms (compound) around 83% for go card and 114% for paper single tickets during the period 2010-2014 (1).

"CPI for the period 2010-2014 has gone up around 9.5% (2).  The sheer magnitude of the fare increases has stagnated patronage on public transport in SEQ.  Fare box revenue is also on the slide.  To continue on this failed fare path is not in the interests of anyone."

"It is then no surprise then that affordability is again the stand out failure for the TransLink Customer Satisfaction KPIs for September 2014 (3). Worst unaffordability ever recorded for rail and ferry! Bus ' affordability' remains in the basement of despair once again!"

"It is a great disappointment to our members, and to many informed public transport users that rather than take the big steps to sort out the failed fare system and the network once and for all, in the shadows of the election a charade poll was put to the public - suggesting that a windfall gain from the cancelled carbon tax can be used to fund cut in fares of 5%."

"Fares on qconnect and TransLinkQLD (Cairns) urban buses are around half to a third the cost of fares in SEQ.  Service improvements would be far more important for these jurisdictions, but they were simply done over by the numbers in SEQ on the poll."

"A new balanced fare system needs to be put in place immediately for SEQ, rather than just a notional cut.  A fare system that drives patronage around the clock, is affordable and fair to all demographics.  The present free after nine paid journeys is easily rorted and is adding to further cost pressures for high base fares. This failed fare paradigm was introduced by the former State Government as free after 10 paid journeys in a week. The Newman Government simply carried on the basic flawed paradigm by changing it 9 paid journeys in a week as the threshold. The end result has been worsening patronage, a failed fare box and  worsening affordability overall."

"The nine and free fare paradigm is leading to massive fare box leakage and is NOT making fares affordable at all, the TransLink Affordability KPI attests to that.  It is just a massive rort and a drain on the fare box! (4)"

"There are very big cost savings to be made to the economy by getting people back on public transport with a sound fare system and a truly connected network.  Fares in SEQ are amongst the worlds most expensive. A token fare cut is going to do very little without real reform (5).  Time to act decisively!"

Contact:

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track http://backontrack.org

1. http://railbotforum.org/mbs/index.php?topic=10048.msg135186#msg135186

2. http://www.oesr.qld.gov.au/products/tables/cpi-all-groups-bris-wt-avg-eight-qtr/index.php

3. http://translink.com.au/sites/default/files/assets/resources/about-translink/reporting-and-publications/open-data/2014-sept-snapshot.pdf  page 14

Affordability KPI September 2014



4. 16 Jun 2014: SEQ: Flawed cost estimates for the nine and free go card rort?
http://railbotforum.org/mbs/index.php?topic=10765.0

5. How much is 5%, well not much really .. also  the scheduled fare increase of 2.5% from January 2015 will not happen.

Some examples:

Zone 12 eg. Helensvale
Go peak $10.87  off 9.06
- 5%      $ 10.32  off $8.60

Paper $15.80
-5%   $15.01

Zone 15 eg. Robina Eudlo
Go peak $13.78  off  $11.03
-5%       $13.09  off  $10.48

Paper $20
-5%   $19

Zone 16 eg. Varsity Lakes, Palmwoods
Go peak $14.85  off  $11.88
-5%       $14.11  off  $11.29

Paper $21.60
-5%   $20.52

Zone 1
Go peak $3.53  off  $2.83
-5%       $3.35  off  $2.69

Paper $5.20
-5%   $4.94

Zone 2
Go peak $4.14  off  $3.32
-5%       $3.93  off  $3.15

Paper $6.10
-5%   $5.80
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Sent to all outlets:

2nd November 2014

Re: SEQ: Fare unaffordability crisis continues

Greetings,

Monday 3rd November a 5% fare cut on public transport for Queensland ( http://translink.com.au/news-and-updates/have-your-say-results ).  A minor welcome relief but sadly we see no signs of proper fare system and network reform, particularly for SEQ.

Interesting that fares for  qconnect and TransLink Cairns (urban bus - regional Queensland) are around half to a third of what fares are in SEQ ( http://www.tmr.qld.gov.au/sitecore/content/TMRInternet/Travel-and-transport1/qconnect/Urban-bus-services.aspx ).  I think regional Queensland would actually prefer more services, their fares are already reasonably affordable.  Not the case in SEQ is it?

Will the public swallow the 5% fare cut gimmick as the way forward?  I think not.  I feel very embarrassed for the hard working staff at TransLink, forced to peddle the stupid politicisation process of public transport as good policy.



Good policy means having the political courage to take the big steps towards proper fare and network reform.

We can only hope that the looming election for Queensland might lead to some proper reform processes being implemented.  More of the same will just lead to more failure.

Enjoy your fare cuts!

Best wishes
Robert

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track http://backontrack.org

Quote from: ozbob on October 31, 2014, 03:41:25 AM
Media release 31st October 2014



SEQ: Fare unaffordability crisis continues

RAIL Back On Track (http://backontrack.org) a web based community support group for rail and public transport and an advocate for public transport passengers has said the TransLink performance snap shot data for September 2014 has again confirmed that fare 'affordability' remains at crisis levels. Worst ' affordability ' ever recorded.

Robert Dow, Spokesman for RAIL Back On Track said:

"Fares for public transport in SEQ have gone up in real terms (compound) around 83% for go card and 114% for paper single tickets during the period 2010-2014 (1).

"CPI for the period 2010-2014 has gone up around 9.5% (2).  The sheer magnitude of the fare increases has stagnated patronage on public transport in SEQ.  Fare box revenue is also on the slide.  To continue on this failed fare path is not in the interests of anyone."

"It is then no surprise then that affordability is again the stand out failure for the TransLink Customer Satisfaction KPIs for September 2014 (3). Worst unaffordability ever recorded for rail and ferry! Bus ' affordability' remains in the basement of despair once again!"

"It is a great disappointment to our members, and to many informed public transport users that rather than take the big steps to sort out the failed fare system and the network once and for all, in the shadows of the election a charade poll was put to the public - suggesting that a windfall gain from the cancelled carbon tax can be used to fund cut in fares of 5%."

"Fares on qconnect and TransLinkQLD (Cairns) urban buses are around half to a third the cost of fares in SEQ.  Service improvements would be far more important for these jurisdictions, but they were simply done over by the numbers in SEQ on the poll."

"A new balanced fare system needs to be put in place immediately for SEQ, rather than just a notional cut.  A fare system that drives patronage around the clock, is affordable and fair to all demographics.  The present free after nine paid journeys is easily rorted and is adding to further cost pressures for high base fares. This failed fare paradigm was introduced by the former State Government as free after 10 paid journeys in a week. The Newman Government simply carried on the basic flawed paradigm by changing it 9 paid journeys in a week as the threshold. The end result has been worsening patronage, a failed fare box and  worsening affordability overall."

"The nine and free fare paradigm is leading to massive fare box leakage and is NOT making fares affordable at all, the TransLink Affordability KPI attests to that.  It is just a massive rort and a drain on the fare box! (4)"

"There are very big cost savings to be made to the economy by getting people back on public transport with a sound fare system and a truly connected network.  Fares in SEQ are amongst the worlds most expensive. A token fare cut is going to do very little without real reform (5).  Time to act decisively!"

Contact:

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track http://backontrack.org

1. http://railbotforum.org/mbs/index.php?topic=10048.msg135186#msg135186

2. http://www.oesr.qld.gov.au/products/tables/cpi-all-groups-bris-wt-avg-eight-qtr/index.php

3. http://translink.com.au/sites/default/files/assets/resources/about-translink/reporting-and-publications/open-data/2014-sept-snapshot.pdf  page 14

Affordability KPI September 2014



4. 16 Jun 2014: SEQ: Flawed cost estimates for the nine and free go card rort?
http://railbotforum.org/mbs/index.php?topic=10765.0

5. How much is 5%, well not much really .. also  the scheduled fare increase of 2.5% from January 2015 will not happen.

Some examples:

Zone 12 eg. Helensvale
Go peak $10.87  off 9.06
- 5%      $ 10.32  off $8.60

Paper $15.80
-5%   $15.01

Zone 15 eg. Robina Eudlo
Go peak $13.78  off  $11.03
-5%       $13.09  off  $10.48

Paper $20
-5%   $19

Zone 16 eg. Varsity Lakes, Palmwoods
Go peak $14.85  off  $11.88
-5%       $14.11  off  $11.29

Paper $21.60
-5%   $20.52

Zone 1
Go peak $3.53  off  $2.83
-5%       $3.35  off  $2.69

Paper $5.20
-5%   $4.94

Zone 2
Go peak $4.14  off  $3.32
-5%       $3.93  off  $3.15

Paper $6.10
-5%   $5.80
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳