Station platform management

Started by ozbob, June 26, 2012, 15:02:28 PM

Previous topic - Next topic

ozbob

Discussion on 'Station platform management to control station dwell times in order to maintain a maximum number of trains per hour in association with seating reconfiguration'.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

SurfRail

One thing that really needs to happen is DDA upgrades at Central 1-4.  If the train was actually level with the platform I expect they would be able to clear them much more quickly.
Ride the G:

HappyTrainGuy

Still doesn't fix the horriable 10kph speed restriction.

Golliwog

Quote from: HappyTrainGuy on June 26, 2012, 18:42:33 PM
Still doesn't fix the horriable 10kph speed restriction.
That's due to the points isn't it? I don't know much about them, but is there anything other than how heavily those points are used that would stop them being replaced with 'better' ones? I think the tunnels might be a bit of a restriction.

I think encouraging passengers to spread along the platform in peak is a must. Perhaps tie it into the annoucement of an approaching service? "The Ferny Grove and Mitchelton service will arrive in approximately 2 minutes. Passengers please spread down the platform to ensure a quick boarding time."

Maybe also do something about pax at Central/Roma St crowding the doors in the PM peak making it difficult for pax to get off?
There is no silver bullet... but there is silver buckshot.
Never argue with an idiot. They'll drag you down to their level and beat you with experience.

HappyTrainGuy

Pretty sure it has nothing at all to do with the type of points. Its the tight left/right curve over short distance before the platform.

SurfRail

Quote from: HappyTrainGuy on June 26, 2012, 18:42:33 PM
Still doesn't fix the horriable 10kph speed restriction.

It certainly doesn't, but they are separate problems. 

Platform 4 might have to be made less straight (like platform 6 at the other end) in order to accommodate a better approach - assuming you can carve out room without falling foul of structural issues.  I doubt any platform DDA works would extend to fixing the underpinning for the buildings on top.

Ride the G:

Gazza


🡱 🡳