• Welcome to RAIL - Back On Track Forum.
 

Wellington studies increasing rail frequency

Started by somebody, March 18, 2012, 21:10:21 PM

Previous topic - Next topic

somebody

http://www.gw.govt.nz/assets/Transport/Public-transport/RegionalRailPlan.pdf page 72

BCR = 1.1 for increasing frequency from 30 minutes to 20 minutes between the peaks

It should be noted that at least according to Robert Schwandl these trains have a lot of staff.

Reducing the staff per train would increase the BCR.  You'd think that they could integrate with their smart card, but not in place yet.

I think the system costs of the order of $NZ130m per year to run, so the $NZ22m increase is actually only a small proportion.

🡱 🡳