Oxley rail station, bus stop B ?

Started by ozbob, January 16, 2010, 04:12:38 AM

Previous topic - Next topic

david

Looks like traffic has been restored to two lanes on Ardoyne Road, but barriers still in place blocking the bus bay. The new footpath has opened.

ozbob

Nearly there ...  ;)















Photographs R Dow 8th August 2010
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Golliwog

Do you know when they poured the concrete in the busbay? If it was only recently poured then that would be why its closed off. Concrete takes almost a month to reach its full strength, but can usually be loaded after a week or two depending on the conditions and the load.
There is no silver bullet... but there is silver buckshot.
Never argue with an idiot. They'll drag you down to their level and beat you with experience.

ozbob

#43
Oxley B bus stop B is now open (work done during today)









Photographs R Dow 8th August 2010

Footnote:  Disabled ramp to station Subway bus stop B side is still closed off though .. ???



Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Mozz

Woohoo glad to see it's open - now where is the "kiss and ride" for those people using Platform 3 (99% of morning commuters use platform 3)

ozbob

#45
 :)

As it was 27th December 2009



It is difficult to tell if the slope is different by eye, but it must be now compliant (that is not steeper than 1:14, it was 1:13.8 before remediation works) and note the hand rails now on the path.  There was much conjecture if it was a foot path or an access ramp to the station ..  but now sorted.

:-c
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

mufreight

Does this now mean that either
(a) no footpath can be steeper than 1 in 14
(b) the footpath at any bus stop can be no steeper than 1 in 14, or
(c) some pedantic nitpicker has justified his existence over a .2 increment in the grade but is incapable of ensuring that the station platform which has been a new construction rather than an already existing one complies with either commonwealth disability access legislation or the Queensland WH&S requirements for a step height to access a train. 

ozbob

#47
All finished except for the ramp to and from the subway.















Access ramp to subway  ... still closed





Photographs R Dow 17th August 2010
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

#Metro



Wow, that feeder bus has terrible service frequency!
Negative people... have a problem for every solution. Posts are commentary and are not necessarily endorsed by RAIL Back on Track or its members.

ozbob

Oxley bus Stop B, looks like it is finished ...   what a saga, but hey sorted now ..  :bu

Subway ramp open.  Even have a nice seat now.









Photographs R Dow 15th September 2010
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

#Metro

Negative people... have a problem for every solution. Posts are commentary and are not necessarily endorsed by RAIL Back on Track or its members.

🡱 🡳