• Welcome to RAIL - Back On Track Forum.
 

Monthly line specific on-time running and reliability April 2022

Started by ozbob, June 15, 2022, 05:27:52 AM

Previous topic - Next topic

ozbob

April 2022

This month was impacted by floods & severe weather recovery. Rosewood line impacted by a major landslip West Ipswich and single line working. 




From https://www.queenslandrail.com.au/aboutus/ourperformance/service-punctuality-and-reliability

====





Spreadsheet --> https://backontrack.org/docs/qr/monthly_otr/2022/apr/otrapr22.ods
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Individual lines

Spreadsheet: https://backontrack.org/docs/qr/monthly_otr/2022/apr/all_lines_monthly_apr19toapr22.ods

























Combining the Queensland Rail total (aggregate) results on the same axes allows a better appreciation of what is happening overall.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

At least overall, Citytrain OTR is getting back on track.

Some surprising line by line results.

Ferny Grove line has become a fallen angel .. 



Rosewood still suffering the effects of the land slip and single line working. 
It is very tight on the section Ipswich - Karrabin.  Lot of trains besides the Rosewood services themselves.  Has some impacts on the Ipswich line as well.

The usual suspects are still not good  :tdown: 

Some excellent line results, Redcliffe Peninsula, Springfield, Gold Coast !  :ok:

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳