• Welcome to RAIL - Back On Track Forum.
 

DART Underground

Started by colinw, September 24, 2015, 09:45:50 AM

Previous topic - Next topic

colinw

Hmmm, Dublin appears to have a case of CRR/BAT disease.

http://www.railwaygazette.com/news/infrastructure/single-view/view/dart-underground-project-to-be-redesigned-to-reduce-costs.html

3 billion Euro tunnel under the city is to be redesigned as lower cost option, as the tunnel section has a negative BCR whereas the overall DART expansion has a positive one. BAT like pronouncements ensuing, including taking a proposed through route and turning it into a terminating route. Nose about to be cut off to spite face perhaps?

🡱 🡳