• Welcome to RAIL - Back On Track Forum.
 

25 Aug 2013: SEQ:Cross River Rail- A tunnel, for trains, how about it Mr Abbott?

Started by ozbob, August 25, 2013, 03:53:12 AM

Previous topic - Next topic

ozbob

Media release 25 August 2013



SEQ: Cross River Rail - A tunnel, for trains, how about it Mr Abbott?

RAIL Back On Track (http://backontrack.org) a web based community support group for rail and public transport and an advocate for public transport passengers again highlights the importance of Cross River Rail (1, 2, 3).

Robert Dow, Spokesman for RAIL Back On Track said:

"Cross River Rail is one of the state's largest and most important state-building projects. The name of the project is perhaps unfortunate as it merely suggests that the project will cross the Brisbane River and is rail. It is so much more than this - the benefits of this project are wide and dispersed across South East Queensland, reaching as far away as Beenleigh, Yarrabilba, Cleveland, Nambour and the Gold Coast for example. It enables rail to become the backbone of the public transport network with the ability to carry large number of passengers."

"By way of analogy, sending cars all to the city on the road system in peak hour will result in congestion as cars queue and get in the way of each other. A similar situation occurs on the rail system - sending trains all to the city on the train system in peak hour will also result in congestion as trains wait to cross the Merivale Bridge into the CBD from the south, and as trains from all lines converge on the core CBD section. The number of additional 'slots' available for trains on this restricted section will exhaust in 2016."

"Around this time, and if nothing is done, our members expect to see trains leaving people behind and a worsening of car congestion on the roads. The bus system already has capacity issues. No government wants to go down in history for deliberately bringing about an avoidable situation like that - just look at Melbourne, Perth or Sydney for examples of transport issues deciding election outcomes."

"The time is right Mr Abbott to accept that a roads only solution is not going to solve any of the transport woes in the major capitals of Australia.  Infrastructure Australia has Cross River Rail as the top priority. Are you a future leader for all of Australia Mr Abbott or just the road lobby?  Now is the hour ..."

"At around $5 billion dollars Cross River Rail is costly, but so is lost business productivity and congestion. The benefits of this project also exceed the costs of the project. Multi-billion dollar car tunnels are also costly, both to construct and also to drive through. Indeed they are the highest toll, highest pollution, lowest capacity solution to deal with transport and urban mobility problems, and yet this hasn't prevented them being constructed."

"Cross River Rail decentralises the central part of the rail network, which means increased capacity and reliability. Currently, if there is an incident between Roma Street, Central, Brunswick Street or Bowen Hills, the entire network is plunged into chaos as all trains must currently travel through this 'core' section. Cross River Rail will provide an alternate core rail route through the CBD and give some much needed redundancy to this critical part of the network."

"RAIL Back On Track is confident that Cross River Rail will be seen for the opportunity that it is - a chance for a state to take on a large, important state-building project and important piece of infrastructure, and a chance for government to get it right. Indeed the construction of the Merivale Bridge and electrification of the QR train system are projects that Queenslanders can be proud of. Cross River Rail will allow future generations to come into the Brisbane CBD from the suburbs and afar for work, study and play, rather than sit in congestion on the roads.

"Cross River Rail - think of it as TransApex (4), for trains!"

"Leader or follower Mr Abbott?"

References:

1. http://www.crossriverrail.qld.gov.au/

2. Brisbane Cross River Rail's future hangs by thread http://www.couriermail.com.au/news/queensland/rail-fixs-future-hangs-by-thread/comments-fnbwr276-1226315918783

3. http://www.couriermail.com.au/news/queensland/kevin-rudd-says-brisbane8217s-cross-river-rail-road-funding-in-doubt-if-he-loses-the-election/story-fnihsrf2-1226691670658

4. TransApex is the car toll tunnel bypass system purported to relieve congestion on roads.  http://www.brisbane.qld.gov.au/traffic-transport/roads-infrastructure-bikeways/tunnels-bridges-major-roads/TransApex/index.htm

Contact:

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track http://backontrack.org
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Sent to all outlets:

26th August 2013

Re: SEQ: Cross River Rail - A tunnel, for trains, how about it Mr Abbott?

Greetings,

Now the dance begins ...

========================================

From the Brisbanetimes click here!

Tony Abbott 'misses chance to play trump card' says rail group

Quote
    Tony Abbott 'misses chance to play trump card' says rail group
    August 25, 2013 - 6:58PM Graham Cairns

    Opposition Leader Tony Abbott could have 'all but guaranteed' a win in Brisbane on Sunday if he'd backed the city's proposed cross-river rail plan, argues a lobby group, but he missed the chance.

    "There were lots of R words - Rudd and Roads, but no Rail" said a disappointed Rail Back On Track's Robert Dow.

    "We really do need ongoing investment from all levels of Government for urban rail. At the moment we are seeing projects advanced in Perth, Adelaide and regional Victoria (but) Cross River Rail is the number-one priority according to Infrastructure Australia.

    "At this stage there's no real progress being made toward getting funding. It's a very necessary project - without it, we are just going to grind to a halt."

    "The bus system is approaching capacity, as is the road system," Mr Dow said, adding "Unless we get some extra capacity through the centre of the rail network we are really going to struggle."

    While Mr Abbott made a number of references to infrastructure in his party launch on Sunday, saying he wanted to see 'bulldozers on the ground', it was obvious that his main focus was on roads, rather than other forms of transport.

    Mr Dow says that was not a real surprise, but his group was given some hope by Mr Abbott's slightly modified recent statements.

    "A week or so ago, Mr Abbott made a comment which was a little different - he said 'We generally don't fund urban rail', instead of his more usual 'We won't be funding'," Mr Dow said."That's slightly different to his normal rhetoric, so while it was always a long shot, we did have some hopes.

    "If a deal was done, we think it would make the election absolutely guaranteed in terms of Queensland. We thought it might have been a trump card he could play," he said.

    Mr Dow says without funding commitments, rail in Brisbane is really going to struggle.

Best wishes
Robert

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track http://backontrack.org

Quote from: ozbob on August 25, 2013, 03:54:04 AM
Media release 25 August 2013



SEQ: Cross River Rail - A tunnel, for trains, how about it Mr Abbott?

RAIL Back On Track (http://backontrack.org) a web based community support group for rail and public transport and an advocate for public transport passengers again highlights the importance of Cross River Rail (1, 2, 3).

Robert Dow, Spokesman for RAIL Back On Track said:

"Cross River Rail is one of the state's largest and most important state-building projects. The name of the project is perhaps unfortunate as it merely suggests that the project will cross the Brisbane River and is rail. It is so much more than this - the benefits of this project are wide and dispersed across South East Queensland, reaching as far away as Beenleigh, Yarrabilba, Cleveland, Nambour and the Gold Coast for example. It enables rail to become the backbone of the public transport network with the ability to carry large number of passengers."

"By way of analogy, sending cars all to the city on the road system in peak hour will result in congestion as cars queue and get in the way of each other. A similar situation occurs on the rail system - sending trains all to the city on the train system in peak hour will also result in congestion as trains wait to cross the Merivale Bridge into the CBD from the south, and as trains from all lines converge on the core CBD section. The number of additional 'slots' available for trains on this restricted section will exhaust in 2016."

"Around this time, and if nothing is done, our members expect to see trains leaving people behind and a worsening of car congestion on the roads. The bus system already has capacity issues. No government wants to go down in history for deliberately bringing about an avoidable situation like that - just look at Melbourne, Perth or Sydney for examples of transport issues deciding election outcomes."

"The time is right Mr Abbott to accept that a roads only solution is not going to solve any of the transport woes in the major capitals of Australia.  Infrastructure Australia has Cross River Rail as the top priority. Are you a future leader for all of Australia Mr Abbott or just the road lobby?  Now is the hour ..."

"At around $5 billion dollars Cross River Rail is costly, but so is lost business productivity and congestion. The benefits of this project also exceed the costs of the project. Multi-billion dollar car tunnels are also costly, both to construct and also to drive through. Indeed they are the highest toll, highest pollution, lowest capacity solution to deal with transport and urban mobility problems, and yet this hasn't prevented them being constructed."

"Cross River Rail decentralises the central part of the rail network, which means increased capacity and reliability. Currently, if there is an incident between Roma Street, Central, Brunswick Street or Bowen Hills, the entire network is plunged into chaos as all trains must currently travel through this 'core' section. Cross River Rail will provide an alternate core rail route through the CBD and give some much needed redundancy to this critical part of the network."

"RAIL Back On Track is confident that Cross River Rail will be seen for the opportunity that it is - a chance for a state to take on a large, important state-building project and important piece of infrastructure, and a chance for government to get it right. Indeed the construction of the Merivale Bridge and electrification of the QR train system are projects that Queenslanders can be proud of. Cross River Rail will allow future generations to come into the Brisbane CBD from the suburbs and afar for work, study and play, rather than sit in congestion on the roads.

"Cross River Rail - think of it as TransApex (4), for trains!"

"Leader or follower Mr Abbott?"

References:

1. http://www.crossriverrail.qld.gov.au/

2. Brisbane Cross River Rail's future hangs by thread http://www.couriermail.com.au/news/queensland/rail-fixs-future-hangs-by-thread/comments-fnbwr276-1226315918783

3. http://www.couriermail.com.au/news/queensland/kevin-rudd-says-brisbane8217s-cross-river-rail-road-funding-in-doubt-if-he-loses-the-election/story-fnihsrf2-1226691670658

4. TransApex is the car toll tunnel bypass system purported to relieve congestion on roads.  http://www.brisbane.qld.gov.au/traffic-transport/roads-infrastructure-bikeways/tunnels-bridges-major-roads/TransApex/index.htm

Contact:

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track http://backontrack.org
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Sent to all outlets:

6th September 2013

RIP Cross River Rail

Greetings,

Cross River Rail is dead!  RIP ...  a victim of political incompetence from both Labor and LNP.



Suffer Queensland.

So what now?

We need to get cracking with Automatic Train Protection.  This will allow a increase in peak linear density of trains but importantly improve safety on the rail network as thousands try to squeeze on to our dear narrow gauge trains.

The Minister for Transport, the Assistant Minister for Public Transport need to start delivering.  Fare review failure, bus review failure, Cross River Rail failure.  Throw in bridge strikes, it is little wonder we are somewhat concerned.

Best wishes

Robert

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track http://backontrack.org

==================================

Media release 9th April 2013 re-released 6th September 2013



SEQ: Suburban rail network needs Automatic Train Protection too!

RAIL Back On Track (http://backontrack.org) a web based community support group for rail and public transport and an advocate for public transport passengers has said the introduction of Automatic Train Protection (ATP) which incorporates improved signalling is well overdue on the suburban rail network in SEQ (1).

Robert Dow, Spokesman for RAIL Back On Track said:

"Automatic Train Protection (ATP) is a system that relays signal information, track speed information and other track information to trains, and can automatically slow or stop trains if they exceed the track speeds or approach signals at STOP at too high a speed. It will also stop trains that pass a signal at STOP unless a specific procedure is followed."

"There are concerns with rail safety generally and it is time that ATP was introduced on the suburban rail network."

ATP is needed because:

Safety - the current Automatic Warning System installed on Queensland Rail's suburban network will not prevent crashes or derailments caused by:

1) Excessive speed around corners or through switches.
2) Excessive speed through red signals compromising the safe stopping distance.
3) Excessive speed through yellow signals, again compromising the safe stopping distance.
4) Excessive speed on approach to dead end tracks, such as at termini.

ATP will prevent the majority of crashes caused by the above.

Capacity - ATP in conjunction with a high capacity signalling system such as European Railway Traffic Management System - ERTMS - level 2 allows for higher train frequencies and/or higher reliability.  This is important as we approach maximum capacity limits on the Merivale Bridge.

Cost savings - ERTMS level 2 has less track wayside equipment, reducing equipment maintenance costs.  Longer term significant cost savings.

Open market - as ERTMS is standards based, multiple manufacturers can bid for contracts. Multiple manufacturers can also be involved in a contract. Leads times may be faster, and approval processes may be simplified.

"It appears that moves to implement ATP have stalled (3).  We can really afford to wait any longer?"

References:

1. Automatic Train Protection (ATP) http://www.railsafe.org.au/section.jsp?id=8684

2. The European Railway Traffic Management System (ERTMS)  http://www.ertms.net/ertms/ertms-in-brief.aspx

3. Rail Safety Systems Assessment of the South East Queensland Rail Network http://www.tmr.qld.gov.au/~/media/Safety/railsafety/rail%20safety%20systems%20assessment%20of%20seq%20rail%20network%20update%202.pdf

Contact:

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track http://backontrack.org
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Sent to all outlets:

17th February 2015

Terminal gridlock around the corner ...

Greetings,

The BaT is gone.  Cross River Rail is a much better project for future transport needs.

The Brisbane bus network does need urgent reform.  Reform will mean more buses more often for more people.  It does not mean cuts and job losses.  The scare campaigns that have been run promoting 'cuts' are very unfortunate.

It will be many many years before we get another rail crossing for Brisbane.  What happens in the meanwhile? Terminal bus and road gridlock?  Clearly reform has to be undertaken so that existing assets can be utilised properly in a truly connected network.

The present policy of the Federal Government of not funding urban rail or public transport has to be changed. I would suggest if it isn't, there will be a change of Federal Government to one that does.

We have put forward some very sensible proposals for Brisbane bus network reform, and will continue to do so.
See Bus reform - our proposal media releases grouped --> http://railbotforum.org/mbs/index.php?topic=11099.0

Cross River Rail is the correct project to move on with.  Have a read here in our Newsletter, Public Transport Matters Special Election Edition as to why that is the case --> http://backontrack.org/docs/ptm/PTM0115.pdf 
More background here --> http://railbotforum.org/mbs/index.php?topic=9972.msg150602#msg150602

Plenty for the new Government to move on with hey?

Best wishes
Robert

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track http://backontrack.org

Quote from: ozbob on August 25, 2013, 03:53:12 AM
Media release 25 August 2013



SEQ: Cross River Rail - A tunnel, for trains, how about it Mr Abbott?

RAIL Back On Track (http://backontrack.org) a web based community support group for rail and public transport and an advocate for public transport passengers again highlights the importance of Cross River Rail (1, 2, 3).

Robert Dow, Spokesman for RAIL Back On Track said:

"Cross River Rail is one of the state's largest and most important state-building projects. The name of the project is perhaps unfortunate as it merely suggests that the project will cross the Brisbane River and is rail. It is so much more than this - the benefits of this project are wide and dispersed across South East Queensland, reaching as far away as Beenleigh, Yarrabilba, Cleveland, Nambour and the Gold Coast for example. It enables rail to become the backbone of the public transport network with the ability to carry large number of passengers."

"By way of analogy, sending cars all to the city on the road system in peak hour will result in congestion as cars queue and get in the way of each other. A similar situation occurs on the rail system - sending trains all to the city on the train system in peak hour will also result in congestion as trains wait to cross the Merivale Bridge into the CBD from the south, and as trains from all lines converge on the core CBD section. The number of additional 'slots' available for trains on this restricted section will exhaust in 2016."

"Around this time, and if nothing is done, our members expect to see trains leaving people behind and a worsening of car congestion on the roads. The bus system already has capacity issues. No government wants to go down in history for deliberately bringing about an avoidable situation like that - just look at Melbourne, Perth or Sydney for examples of transport issues deciding election outcomes."

"The time is right Mr Abbott to accept that a roads only solution is not going to solve any of the transport woes in the major capitals of Australia.  Infrastructure Australia has Cross River Rail as the top priority. Are you a future leader for all of Australia Mr Abbott or just the road lobby?  Now is the hour ..."

"At around $5 billion dollars Cross River Rail is costly, but so is lost business productivity and congestion. The benefits of this project also exceed the costs of the project. Multi-billion dollar car tunnels are also costly, both to construct and also to drive through. Indeed they are the highest toll, highest pollution, lowest capacity solution to deal with transport and urban mobility problems, and yet this hasn't prevented them being constructed."

"Cross River Rail decentralises the central part of the rail network, which means increased capacity and reliability. Currently, if there is an incident between Roma Street, Central, Brunswick Street or Bowen Hills, the entire network is plunged into chaos as all trains must currently travel through this 'core' section. Cross River Rail will provide an alternate core rail route through the CBD and give some much needed redundancy to this critical part of the network."

"RAIL Back On Track is confident that Cross River Rail will be seen for the opportunity that it is - a chance for a state to take on a large, important state-building project and important piece of infrastructure, and a chance for government to get it right. Indeed the construction of the Merivale Bridge and electrification of the QR train system are projects that Queenslanders can be proud of. Cross River Rail will allow future generations to come into the Brisbane CBD from the suburbs and afar for work, study and play, rather than sit in congestion on the roads.

"Cross River Rail - think of it as TransApex (4), for trains!"

"Leader or follower Mr Abbott?"

References:

1. http://www.crossriverrail.qld.gov.au/

2. Brisbane Cross River Rail's future hangs by thread http://www.couriermail.com.au/news/queensland/rail-fixs-future-hangs-by-thread/comments-fnbwr276-1226315918783

3. http://www.couriermail.com.au/news/queensland/kevin-rudd-says-brisbane8217s-cross-river-rail-road-funding-in-doubt-if-he-loses-the-election/story-fnihsrf2-1226691670658

4. TransApex is the car toll tunnel bypass system purported to relieve congestion on roads.  http://www.brisbane.qld.gov.au/traffic-transport/roads-infrastructure-bikeways/tunnels-bridges-major-roads/TransApex/index.htm

Contact:

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track http://backontrack.org
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


🡱 🡳