Interesting find ... Advancing the Rail Industry Queensland Briefing

Started by ozbob, October 10, 2014, 14:18:40 PM

Previous topic - Next topic

ozbob

Advancing the Rail Industry Queensland Briefing

--> here! ext PDF

Some interesting stuff in this ^ a number of presentations ..

eg.

Rail Industry Briefing | 6 June 2014

slide 71

Network and signalling upgrades

•Outer network stabling sites
-Required to accommodate the expansion of the rollingstock fleet and the projected future growth of the SEQ rail network.
-Will improve the operational efficiency of the rail network by reducing the amount of 'dead running' across the network.
-Four confirmed sites: Robina, Banyo, Woombye and Elimbah.
-Construction to commence in 2015 and completed by 2016.
•Signalling upgrades
-European Train Control System Level 2.
-Queensland Rail business case is evolving.
-Review opportunities for funding models to ease the upfront cost with a staged implementation over a 10 year period.

slide 72

Planned activities and studies

•Other planning studies underway including:
-SEQ Capacity Improvement Study, Northern Surface Connection via Mayne Yard, Clapham Stabling & Salisbury to Park Road Infrastructure Requirements and Brisbane to Cairns Rail Line Capacity Improvement.

•Coomera to Helensvale duplication:
-Duplication and signal upgrades on the Gold Coast line.
-Construction anticipated to start in 2014/15 and to be completed by 2018 to support the Commonwealth Games.

slide 74

Linking the rail network

•Beerburrum to Landsborough
-Track duplication between Beerburrum and Landsborough
-Support the future demand for freight rail operations on the North Coast Line
-Detailed design completed
•Gold Coast Rapid Transit Expansion
-Potential link from University to Helensvale
-Preliminary planning and option analysis
-Business case development underway
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

-European Train Control System Level 2.
-Queensland Rail business case is evolving.
-Review opportunities for funding models to ease the upfront cost with a staged implementation over a 10 year period.


Nice work google!   is there hope?   :P
Half baked projects, have long term consequences ...