Queensland UTC +10
Terms of use Privacy About us Media Contact

Links

Author Topic: Rail infrastructure opening dates  (Read 1160 times)

Offline BrizCommuter

  • Member
  • *****
  • Posts: 3017
Rail infrastructure opening dates
« on: February 07, 2016, 08:50:12 AM »
I'm currently writing an article based on Inner City Rail Capacity Study recommendations vs what has happened by 2016.
I require information on the opening dates of the following:
- Caboolture to Beerburrum duplication
- Stabling upgrades at Caboolture
- Corinda to Darra quad (of which 3 electrified) - was this before Richlands Line opened or same time?
- Redbank stabling upgrade
- Robina stabling upgrade
Thanks in advance for any assistance.

Offline SurfRail

  • Global Moderator
  • Member
  • *****
  • Posts: 7575
Re: Rail infrastructure opening dates
« Reply #1 on: February 07, 2016, 09:20:04 AM »
For Robina, the 8th to 11th roads are being built right now - the previous upgrade was to take it from 5 to 7 roads but I can't quite recall when that happened.  I suspect it was at or around the time the duplication projects were happening around 2008-ish, because I recall some loonies thinking that the western yard was a New World Order concentration camp.
Ride the G:

Offline ozbob

  • Administrator
  • Member
  • *****
  • Posts: 86021
    • RAIL Back On Track
Re: Rail infrastructure opening dates
« Reply #2 on: February 07, 2016, 09:57:06 AM »
Corinda to Darra - was triplication (NOW QUADRUPLICATION)

>> http://railbotforum.org/mbs/index.php?topic=225.0
Half baked projects, have long term consequences ...
Bobs Blog  Instagram   Facebook  @ozbob13@mastodon.social

Offline ozbob

  • Administrator
  • Member
  • *****
  • Posts: 86021
    • RAIL Back On Track
Re: Rail infrastructure opening dates
« Reply #3 on: February 07, 2016, 09:59:08 AM »
SEQ:   Caboolture to Beerburrum Track Duplication opens with style!

>> http://railbotforum.org/mbs/index.php?topic=2134.0
Half baked projects, have long term consequences ...
Bobs Blog  Instagram   Facebook  @ozbob13@mastodon.social

Offline BrizCommuter

  • Member
  • *****
  • Posts: 3017
Re: Rail infrastructure opening dates
« Reply #4 on: February 07, 2016, 09:24:33 PM »
Thanks for the information ozbob and SurfRail.

 

Sitemap 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 


“You can't understand a city without using its public transportation system.” -- Erol Ozan